A Street-by-Street Calendar for West Bozeman, From North 27th to the Cattail Trail

Until this month, North 27th Avenue ran north from Durston and stopped at Baxter, ending in a wall of orange cones. Past the cones it turned into Thomas Drive, a dead-end dirt road. The Bozeman Daily Chronicle reported that the cones came down on a Tuesday morning in November. By the next morning, cars, trucks and school buses were using the new stretch to Cattail Street.

That one connection sums up how the west side of Bozeman works right now. The street grid is unfinished, and the pieces are being filled in on separate schedules. One neighborhood got its missing link this fall. Another sits beside a road that stays closed to traffic until a roundabout scheduled for construction next summer is open. A third borders a City-owned field where the Commission took its next step on November 10. If you're comparing homes out here, compare where each block falls on the City's calendar along with the house itself.

North 27th is finished, and the drive to Costco is different now

The extension cost $5.7 million and was built by Knife River. It turned Thomas Drive into a median-divided avenue with paved bike and pedestrian paths on both sides, plus a traffic light at Baxter and a roundabout at Cattail. The roundabout has been open since late August. North 27th now runs without a break from Durston Street to East Valley Center Road. The Chronicle reported that the City had been planning the extension for 20 years.

The Chronicle also described what drivers did before. Coming from Baxter toward the commercial area with Costco, WinCo and Target, they cut through Cattail Creek neighborhood streets or took their chances on North 19th Avenue. So the change reaches two groups. Homes along Baxter and Durston now have a straight route north to errands. Streets inside Cattail Creek lose a cut-through they never asked to be. Irrigation for the grass on the median and boulevards won't be recommissioned until spring, so the avenue will look half-landscaped through the winter.

On a winter showing, a home near North 27th looks the way it will look for years. Most of the rest of the west side doesn't yet.

Fowler Avenue stays closed until the Durston roundabout is built

Fowler Avenue is the bigger project. The City plans to run it from Oak Street to Huffine Lane as a north-south corridor between 19th and Ferguson. Phase 1 covers Oak to Durston. In September, the City awarded that contract to CK May Excavating for $4,018,965, below the engineer's estimate of $5,555,879.50.

The sequencing matters if you'll be living next to it. The City's Fowler project page says Phase 1 will shut down for winter, with final paving and landscaping finishing in spring 2027. It also says every part of Phase 1, including the side-street connections, stays closed to traffic until the roundabout at Fowler and Durston is open. That roundabout was moved into Phase 2, Durston to Babcock, which is planned for construction in summer 2027. While it's being built, the new Fowler-to-Babcock connection is meant to give the Fowler Place Subdivision a second way in and out.

In practice, Phase 1 can be paved and planted by spring and still carry no traffic until the Durston roundabout opens sometime after summer 2027 construction begins. A buyer touring a home on a side street off the corridor this winter is looking at a road that's about two construction seasons from being used.

The work also reaches beyond the corridor. The City's street report for the week of November 22 schedules a temporary closure of the West Oak Street and Davis Lane roundabout from November 30 through December 11 for Fowler water and sewer connections. Local access stays open and through traffic is detoured.

Neighbors haven't agreed on what the road means for them. In a July 2025 report from KBZK, some nearby residents hoped the connection would draw traffic off 19th Avenue and other residential streets. Others worried about losing green space they used every day. Both outcomes can come true on the same street, which is why the timeline matters more than any one prediction.

The ten acres between Oak and Farmall have a next step

The open land along Fowler between Oak Street and Farmall is City-owned, and it sits next to the Harvest Creek neighborhood. For most of the past year its future was an open question. On November 10, 2026, the City Commission voted 5-0 to have staff file an annexation and zoning application for the roughly 10-acre site with RB zoning. The plan is below-market, for-sale homes for households earning about 110 to 150 percent of area median income.

The vote followed an 11-month consensus process with Harvest Creek residents and other neighbors that included 49 individual interviews, three listening circles and two design charrettes, according to The Bozeman Brief, CivicCast's summary of the meeting. Neighbors who took part talked through the mass and scale of buildings near existing homes, and several Harvest Creek residents spoke at the meeting itself.

The vote started a process rather than finishing one. Staff estimated about six months for the application to move through planning review, with a community check-in after that, and no developer or construction start was named. For someone looking at a home in Harvest Creek this winter, the open land next door has a stated purpose and a next public milestone around late spring or early summer 2027. The City's Fowler housing page is where that process is posted as it moves.

The trail tying the west side together runs on the longest clock

North 27th and Fowler connect the west side for drivers. The Cattail Creek Corridor and Anchor Route will connect it on foot and bike. The City Commission approved the master plan in September 2026, and KBZK described a route of roughly 3.5 miles from East Valley Center Road to the Gallatin Valley Mall that links existing west-side trails and green spaces.

The plan splits the route into four sections:

  1. Cattail Lake to Cattail Street, along the Cattail Creek subdivision's park system
  2. Cattail Street to Baxter Lane, an undeveloped gap that will need future park dedication or trail easements
  3. Baxter Lane to Durston Road, including West Winds and Harvest Creek parks
  4. Durston Road to the Gallatin Valley Mall, with Bozeman Pond Park at the south end

The City's approval update plans engagement with the West Winds HOA and nearby residents in 2027, trail and revegetation work near Greenway Park, and improvements and wayfinding starting as early as 2027. It gives 2030 as the earliest completion date for the full route.

Part of the route already works. In November 2025, the Gallatin Valley Land Trust finished an east-west connector in West Winds: a six-foot gravel trail and an eight-foot timber pedestrian bridge linking toward Tschache Lane, Buckrake Avenue and the Raptor Route, according to the West Winds HOA. The section between Cattail Street and Baxter Lane is the opposite case. It's a gap on the plan, and closing it depends on land that hasn't been dedicated yet.

At the Oak Street end, Bozeman Sports Park held a ribbon-cutting on October 7 for two new synthetic-turf fields that add year-round capacity for rugby, football, lacrosse and soccer, NBC Montana reported. The City, Bozeman School District 7, the Montana Institute of Sport and community donors funded them. The City's parks planning page also lists a new Oak Street parking lot at the Sports Park as opened in spring 2026. Farther east on Oak, the City reports that the Oak Street and Flanders Mill Road intersection was rebuilt in 2025, which matters to anyone comparing homes in and around Flanders Mill.

Lining up a west-side address with its date

Where Status on November 26, 2026 Next date on the City's calendar
North 27th, Baxter to Cattail Open since November 10 Median and boulevard irrigation in spring 2027
Fowler, Oak to Durston Under contract, winter shutdown ahead Paving and landscaping finish spring 2027; stays closed to traffic until the Durston roundabout opens
Fowler, Durston to Babcock Planned Construction summer 2027, including the Fowler/Durston roundabout
Oak and Davis roundabout Open Temporary closure November 30 to December 11
Fowler housing site by Harvest Creek Annexation and RB zoning application directed November 10 About six months of planning review, then a community check-in
Cattail Creek Anchor Route Master plan approved September 2026 Work near Greenway Park and West Winds as early as 2027; full route 2030 at the earliest
Bozeman Sports Park Two new turf fields open since October Open for year-round field use

Bozeman's median home sale price in October 2026 was $825,000, a figure Nathan Stein of the Headwaters Community Housing Trust cited in public comment at the November 10 meeting. That median covers the whole city. On the west side, the same money can buy a home on a block whose streets are finished or a home on a block that will change around its owner over the next two to four years. A good offer starts with knowing which one you're looking at.

FAQ

Can I drive the new section of Fowler Avenue this winter? No. The City says all of Phase 1, side streets included, stays closed to traffic until the Fowler and Durston roundabout is finished, and that roundabout is part of Phase 2, planned for summer 2027.

Has anyone been picked to build the Fowler housing? No developer or construction start was named at the November 10 meeting. The decision started an annexation and zoning application that staff expect to take about six months.

Which part of the Cattail trail can I walk now? The West Winds connector trail and timber bridge have been open since November 2025. The full route from East Valley Center Road to the Gallatin Valley Mall has a 2030 earliest completion date.

If you're weighing homes on Bozeman's west side, Chelsea Stewart Real Estate can walk through the addresses on your list with you and line each one up against the Fowler, North 27th and Cattail Creek schedules, so you know what the street will look like the year you move in. If you already own near one of these corridors and want to know how buyers see your block, request a free home valuation.

Work With Us

We are dedicated to working hard, delivering success, and making every client we work with a priority. As a team, we bring an unparalleled customer experience to the Bozeman real estate sector. Our combined skills ensure that your real estate dreams come to life!

Follow Us on Instagram